Overbreak in TBM Tunnel
--- on behalf of
Contractor ---
A tunnel in
Milwaukee experienced unusual and excessive overbreak, including the invert even
though the rock was cut by a tunnel boring machine.
Although the
contractor required only two shifts for the learning curve, their excavation
performance was far below expectations.
Anticiapted /
Encountered geology, encountered overbreak, and encoutnered TBM performance was
presented on a single graphical page as follows:
OUTCOME: Owner settled with Contractor
|