'geotechnical, tunnel boring, differing site conditions'

\n

GeoConSol
Geotechnical & Tunnel Consultants

A consultant is a universal observer who can look at a problem outside the environment in which the problem came to be, thereby creating a solution that was never possible before.  Fernando Flores

spacer
nn nn nn
nn
A-Misrepresentations
B-Type 1 or 2?
C-Jacked Pipe Failure
D-Top of Rock
E-PI Litigation Support
F-Geotech Assessment
G-Microtunneling Hard/Soft
H-Machine Failure
I-Boulders-Tunnel Boring
J-Boulders-Microtunneling
K-Plowing Utilities
L-Rock Socket Overrun
M-Bored Tunnel Inflow
N-Rock Comminution
O-Sub-Std TBM Performance
P-Bored Tunnel-Shear Zone
Q-Disputes Resolution
R-Problem Proj. Completion
S-Bored Tunnel Overbreak
T-Auger Sampling Problems
U-Bored Tunnel Delay
V-Hoe Ram - Failure to Rely
Peter J. Tarkoy
Misicuni, difficult, bored, tunnel, adverse, tunneling, conditions, Tarkoy

Project Analysis-Misicuni
--- on behalf of Bolivian government ---

We were asked by a commission appointed by the President Hugo Banzer of Bolivia to identify cause of difficulties, evaluate the prognosis for completion , and make recommendations for changes to improve excavation performance, for the Misicuni tunnel in the high Bolivian Andes.

Earlier we had recommended one of our colleagues, Antony Ivan-Smith to serve as the tunnel superintendent.  After years of standstill, Mr. Ivan-Smith managed to accomplish in 2 months what had taken 2 years before his arrival.  He succeeded in advancing the tunnel at record excavation rates (up to 845 m/month) in adverse geological, physical, and logistical conditions.

Congratulations Antony for the light at the end of the tunnel !!!!!!

PROJECT SUCCESSFULLY COMPLETED WITH RECORD PROGRESS UNDER ADVERSE CONDITIONS

 